Monday, 26 November 2012

The next step

All the purlins are now pegged but there are still a few pegs to make to fit to the main frame.

I have arranged for the lean to post supports to be made by Dean Forge. The posts will be galvanised and fitted in concrete - the oak post will be drilled at the base and sit on the plate and spigot - see drawing.

Thursday, 15 November 2012

Fixing Purlins

Over the past two days (allowing time for other things) I have managed to fix the purlins on one side of the roof with hexagonal pegs. These pegs can be difficult to cut to the correct size to ensure a tight fit but not too tight to damage the peg but, as with most things, practice helps.




Sunday, 11 November 2012

The last mortice and tenon

The lean to frame is now complete - having cut the last mortice and tenon yesterday. I spent some time today preparing the ground to lay some concrete to form the base for the lean to. I have pegs to cut and fit whilst waiting for the oak rafters but it seems rather strange (and slightly unreal) to have finished the frame.

View from the "lean to" end
There is a lot more work to do to finish the shed so I won't be looking for other things to do just yet.

The vertical posts of the lean to are
temporarily supported

Sunday, 21 October 2012

The Last Purlin

I managed to get the fourth purlin on to the roof frames exactly one week later! However I have started the "lean to" frame (storage for Barbara's bee keeping equipment) and have fitted two small braces to the rear purlins. I have just two more to fit. I was originally planning to use tanalised soft wood for the rafters but have now ordered some oak from http://www.anton-coaker.co.uk    
One of the roof braces fitted between the
two rear purlins

Sunday, 7 October 2012

The First Purlin

 
Managed to fit the first purlin yesterday. They will need to be pegged and some additional braces for the roof may be required. If the weather stays fine this week I am hoping to have all four in place (we shall see). 

Friday, 5 October 2012

Lifting and moving

The final roof frame in position
Quite an occasion yesterday - after a small amount of woodwork the last roof frame was lifted into position. The rest of the day was spent moving scaffolding and then the timber for the four purlins from the storage space in the garden to the shed. These are the last four heavy timbers that I will have to move. Not a great deal of work needs to be done to prepare these - just cut to length and then four cut-outs on each one to sit over the roof frames.

Wall and roof frames with scaffolding
positioned to hoist purlins

Wednesday, 3 October 2012

Peg making



Rectangular blanks
Oak log with Froe
Cutting rectangular blanks
   
Cutting square blanks
 
Square blanks

Shaping pegs from
square blanks


Shaping pegs from
square blanks
Testing the diameter of
the peg
Finished pegs















I managed to work for a few hours on the shed this morning (before the rain started) and now there is only about 30 minutes work and the final end frame will be complete. Still for once I don't mind it raining as I have a lot of pegs to make. I have been making pegs throughout the construction of the shed - usually when the weather is not so good. However, I still need to make a lot and before I can lift the final frame I need to peg the joints to ensure it is secure.

I make the pegs using a Froe (to cut the square blanks) and a draw knife to shape the pegs from the blanks. I hold the timber in my Workmate (in a rather non-traditional way) when shaping the pegs.