The story of the construction of a green oak framed shed
Friday, 5 October 2012
Lifting and moving
The final roof frame in position
Quite an occasion yesterday - after a small amount of woodwork the last roof frame was lifted into position. The rest of the day was spent moving scaffolding and then the timber for the four purlins from the storage space in the garden to the shed. These are the last four heavy timbers that I will have to move. Not a great deal of work needs to be done to prepare these - just cut to length and then four cut-outs on each one to sit over the roof frames.
Wall and roof frames with scaffolding positioned to hoist purlins
No comments:
Post a Comment